冷柜玻璃门

Aluminum spacer, PVC spacer and traditional warm edge spacer hollow insulated glass cooler/refrigerator door have dissatisfying sealing performance. The argon filled inside the cavity of insulating glass unit (IGU) cavity quickly leaks or lose performance. After 1-2 years,argon percentage drops to below 80% and glass will lose its heat insulation and energy saving effect.

Because of the poor sealing performance, water vapor and moisture will soon penetrate into/enter the hollow glass cavity, causing condensation/dew in the glass cavity, evening forming water droplets, and the glass door will lose energy saving performance and has to be replaced with new ones.

To overcome this argon leak problem, we imported flexible ESG spacer insulated glass machine from Europe, and design a new generation of insulation glass and doors for upright beverage display cooler/freezer.

常见问题

如果您是国内用户,请直接联系15266233186了解信息或预订工厂参观时间。
如果您是海外客户,以下常见问题解答供您参考:

  • Are you a manufacturer factory or trading company?

    We have our own glass processing and glass door manufacturing factory with more than 10 years’ experience in glass door production for electric appliance doors.

  • Do you have any warranty?

    For high end glass doors, we provide all life guarantee for insulated glass, same service life as your cooler/freezer unit, 100% no leaking or condensation inside glass 

    For traditional glass doors, We have 15 months warranty for insulated glass. 

    The hardware usually provide 15 month warranty.

  • Can you provide sample for testing?

    According to the sample qty and complexity in process, samples would be provided around 7-15 working days. 

    Due to the high cost for samples(silk screen mold etc), buyer may need to take the sample and freight cost.

  • How long is the lead time that you can make the delivery after order confirmed?

    According order quantities and complexity in assembly, our product lead time is usually 15-28 working days after payment received .

  • How long you can receive the order after delivery?

    By express: 4-7 days to arrive in your factory by express. 

    By air freight: 4-7 days to arrive to your airport.

    By sea freight: 3-30 days to arrive at your sea port.

  • How is your package? Is it safe if we have LCL shipment ?

    We use soft Foam + seaworthy wooden crate. We have our own wood crate factory, and our wood box is supplied to other partners in glass and door industry, and even cooler/freezer customer. During our export FCL shipment, even the LCL shipment, we almost haven’t receive complaint from customer about our wood crate.

  • What’s your payment terms?

    30%-50% deposit advance with proforma Invoice confirmed(we start to process the glass doors) ,  50%-70% balance before delivery

    L/C at sight is acceptable (for LC risky countries, we will check the bank first)

    100% TT(sample order)